Cargando...

Floor processing accuracy

Temas de Geología General
xiao1236
Fluorita
Mensajes: 3009
Registrado: Vie, 09 Dic 2016, 02:30
Gender: None specified

Floor processing accuracy

Mensajepor xiao1236 » Jue, 23 Nov 2017, 11:18

<P>Floor coverings pay attention to "opportune" days means sunny weather, it is best to install in about 7 days are sunny, no rain; location is asked not to dry before installing the floor on the ground; that is human must Find professional workers for your installation of the floor. At the same time, under the floor covered with a professional moisture-proof mats to prevent the floor from damp. In particular need to be reminded that, within 48 hours after the floor finish, to avoid walking and placing heavy objects, leaving sufficient time for the floor adhesive. Just paved the best floor with a vacuum cleaner or broom cleaner.</P>
<P>Whether it is light or matte paint floor, the selection should pay attention to observe the floor surface paint film is uniform, plump, smooth, no paint and other defects, bubbling, holes, collapse phenomenon is beyond the national standard.</P>
<P>As many low-cost and low-priced brands are unable to process environmentally safe materials for flooring products, the residues of large quantities of formaldehyde and toxic and harmful substances may cause potential health risks to infants and pregnant women. Therefore, when consumers purchase, Must pay attention to check whether the product meets environmental requirements.</P> "cubierta de madera cuesta 20 por 20,piscinas de madera y plástico,exterior wooden railing plans "

Comparte esto



Comparte esto


Volver a “Geología General”

¿Quién está conectado?

Usuarios navegando por este Foro: choonsog y 2 invitados